Project Details
Client : | Foresight Wymeswold |
Plant Size : | 34MW |
Service : | O&M |
Location : | Wymeswold, United Kingdom |
Annual Generation : | 49.64 GWh |
Performance Ratio : | 96% |
Our team took over the site in December 2015; the site is 34MW but was performing badly with multiple issues, such as 288 string boxes that needed to be replaced, regular inverter failures and large sections of the park disconnected.
Within 3 months, our engineers recovered the production back to 99% availability and reconnected 1.5MW of faulty or disconnected strings, resulting in a jump of PR to 96%. The park has consistently produced above expectations since the intervention.